A deadman
anchor system–4 in. schedule 40 PVC pipe–was installed
in the trench at the top of the slope and then the perforated geocell
system sections were placed. Heavy-duty TP-91 tendons were run
through the pre-drilled 4 in. cells and secured by wrapping and
tying to the deadman anchor. The use
of ATRA® restraint clips spread the working load of the gravel infill from
the geocells to the tendons. |
 |
An
upper anchor trench was excavated along the outside perimeter
of the access road at the top of the slope to anchor the various
geosynthetic products that formed the liner system and final
slope cover.
The
waterproof layer of textured HDPE lining was installed over the
prepared subgrade followed by a 28-ounce nonwoven geotextile
protection fabric.
With
the composite liner system in place and tested, installation
of the geocell layer began. |
|