Due to the cost of the installation equipment and personnel, the
size of the project often determines the cost effectiveness of HDPE.
HDPE
is a good lining product, but it can be difficult to install due
to its lack of flexibility and the technical nature of field work.
If the project is specified around HDPE, extra care should be taken
in selecting your installation contractor. Experience requirements
should be a minimum of 5 million sq. ft. (This is not to limit the
competition, but it is to ensure that the end product is installed
satisfactorily and will meet its intended requirements.)
HDPE
performance life is enhanced with the use of additional geotextile
protective materials or natural materials over rock and concrete.
|